Featured Projects: Blackwater Refuge
Blackwater National Wildlife Refuge: Marsh Restoration
Summary
Dredge America was selected as the most qualified contractor to perform marsh restoration services for the Blackwater National Wildlife Refuge (NWR).
The project, located in Cambridge, Maryland capitalizes on the experience and expertise Dredge America gained from the Prime Hook Restoration Project.
Dredge America helped restore the natural salt marsh using a thin layer deposition method of dredging. By spraying “dredge material” over the existing marsh surface, we raised the existing marsh platform to provide plant resiliency, combating rising sea levels at the site.
Our goal for the project was to remove and place approximately 26,000 cubic yards of sediment to restore up to 30 acres of the fragile marsh habitat.
Completing the first large-scale wetland restoration project ever attempted at Blackwater, and the first thin-layer project in the Chesapeake watershed, the restoration was a resounding success, having been completed on time and under budget.
The non-profit owner, The Conservation Fund, in partnership with the U.S. Fish and Wildlife Service (USFWS), are extremely satisfied with the results.
The Challenge
Since 1938, Blackwater’s 29,000-acre preserve has lost approximately 5,000 acres of marshland. Scientists predict that virtually all of today’s tidal wetlands in the Chesapeake Bay could erode to open water by the end of the 21st century, as sea levels rise at an incredible rate due to the thermal expansion of ocean waters.
According to area experts, from 1985 through 2015, the sea level in the Choptank River — the closest monitoring point to the Blackwater NWR— increased by more than 5 millimeters a year, which is among the highest amounts in the state.
“According to the Maryland Commission for Climate Change, Maryland’s sea level could rise 3.6 feet by the year 2100.”
This restorative process is vitally important to saving the marshes at Blackwater, which provide critical habitat for migrating birds and waterfowl and storm surge buffer for surrounding communities.
The Strategy
In 2012, Hurricane Sandy hit the east coast, tearing through towns, beaches, and everything else in its path. Also affected by the storm was the Prime Hook National Wildlife Refuge. In an already decaying state, Sandy reduced the marshes elevation resulting in a saltwater increase, killing freshwater vegetation and valuable natural habitat.
In 2015, Dredge America was awarded the contract and started it’s effort to dredge over 30 miles of canals to restore the marsh. Being the largest Sandy relief project performed to date, we teamed up with AMEC Foster Wheeler, an engineering and project management company.
The ultimate goal was to restore and dredge the channels to distribute tidal waters complete with a low-rise dune. This coastal wetland restoration improves the ability of the refuge marshes to withstand future storms and sea level rise and improves habitat for migratory birds and other wildlife.
Thousands of species depend on Prime Hook for the necessities of life: food, water, shelter and space. As a result of the project completion, the marsh has already started transforming back into its natural state. Fish such as white perch and bluefish have found new habitat in deep-water channels and saltwater is no longer flooding the farm fields adjacent to the refuge.
Following completion, the project received high praises from all associated parties. Thanks to the Dredge America crews, the project has been deemed “one of the most successful restoration projects in United States history” by former DNREC Secretary Collin O’Mara.
The Result
The restoration project at Blackwater NWR will benefit the wetland ecology at the refuge in several ways. Raising the surface of the marsh by 4-6 inches will improve the health of marsh vegetation allowing oxygen to reach the marsh plant roots and scientists expect native grasses will sprout through the dredge material within a year or two.
The results of the project should start to reverse the current disintegration of the marshland root zone, caused by excessive flooding, and add several decades to the life of the marsh. It should also restore the site to a high marsh condition, above the level of daily tides, which is the preferred habitat of Black Rail and Saltmarsh Sparrow.
Maryland’s Department of Natural Resources analysts say salt marshes are among the most valuable ecosystems in the state, as they help protect against inland floods, provide habitat for commercial fish species and filter pollution, functions that are thought to be worth several thousand dollars per acre.
The $1.1 million ongoing project is being funded with federal grants for coastal resiliency projects offered in the wake of Superstorm Sandy in 2012.
Federal officials recently announced the acquisition of 400 acres along the Nanticoke River from The Nature Conservancy. Much of the land in the acquisition isn’t considered prime marshland, but the plan is to convert the area to a primary habitat by 2050.